(512) 775-1918

Dallas, TX · Core Service

Dallas, TX Construction Site Cleanup

Trackout control, sediment removal, and magnetic nail sweeping for active job sites across the Dallas metro — with SWPPP-ready documentation on every visit.

At a glance

ScopeTrack-out, mud & site debris, more
ComplianceSWPPP-aligned practices
SchedulingRecurring or milestone-based
CoverageDallas metro
Bundle servicesDebris removal & more
Video coming soon

The gate tells the inspector everything

DFW is one of the busiest construction markets in the country, and Moore Clean keeps its job sites clean — office conversions and towers along US-75, the never-finished LBJ corridor, distribution and industrial along I-30 and the George Bush Turnpike, and subdivision phases sweeping north through Frisco, McKinney, and Celina. Blackland prairie clay tracks like paint — one rain and every truck leaving your gate is signing the street.

Cleanup here is a permit condition. Sites operate under the TCEQ construction general permit (TXR150000), and the City of Dallas construction stormwater program requires operators to keep sediment out of the drainage system — and can ask for your SWPPP on the spot. Every Moore Clean visit is dated and documented so the binder answers before you have to.

The pace is not slowing: the Dallas area consistently ranks among the national leaders in new construction activity tracked by the U.S. Census Bureau’s Building Permits Survey — and every permit issued is a future site with track-out to control.

Dallas routes

Clean haul routes across DFW job sites.

What’s included

What construction site cleanup includes

  • Trackout & haul-route sweeping
  • Sediment removal at gates & entrances
  • Magnetic nail & metal debris sweeping
  • Paving & milling cleanup
  • SWPPP-support documentation per visit
  • Pre-inspection & pre-pour sweeps
  • Final cleanup before turnover
  • Recurring service for phased builds

Our TYMCO DST-4 dustless sweeper is built for the fine, sticky material North Texas sites shed, and magnet bars pull nails and tie wire off haul routes before they end up in a tire. At close-out, a final pressure wash readies flatwork for turnover.

Pad-site construction cleanup underway at a DFW retail center

Why it matters

What does SWPPP compliance require from cleanup?

Under the EPA’s NPDES construction stormwater program and the TCEQ general permit (TXR150000), operators must keep sediment on site — and the street outside the gate is where it leaves first. Trackout is the most visible violation an inspector can find, sitting in plain view on the drive in, and in Dallas that street drains to the Trinity.

Scheduled sweeping converts the liability into a record: dated visits showing haul routes swept, gates controlled, and sediment hauled off — documentation that satisfies the City of Dallas construction stormwater program and holds up in any inspection.

Moore Clean street sweeper working a construction site

Construction Cleanup Power SweepingStreet sweepers pick up nails, small debris and dust on site.Get a quote →

Commercial debris removal

Debris RemovalLoaded, hauled, and documented — piles cleared without slowing the site.Learn more →

Pressure washing concrete at a commercial construction site

Power WashingPressure washing clears caked mud and residue from pads and walkways — runoff recovered.Learn more →

Documentation

Every Dallas site sweep, documented and filed.

Where we work

Serving job sites across the Dallas metro

Grading and debris control on a Dallas-Fort Worth commercial site

From our Petal Street facility off LBJ we cover Downtown and Uptown tower work, Deep Ellum and Bishop Arts infill, industrial along I-30 toward Mesquite and Garland, and the subdivision engine running north through Plano, Frisco, and McKinney. Weekly service on active phases, pre-inspection sweeps on short notice, full final cleanup at turnover.

Construction site cleanup is one of five core services we run in Dallas alongside street sweeping, parking lot sweeping, pressure washing, and porter service — see everything we do on our Dallas page.

Moore Clean — Dallas
11130 Petal St, Dallas, TX 75238 · (512) 775-1918 · Open 24 hours

Questions

Dallas construction cleanup FAQ

Can you service fast-moving subdivision phases in Frisco and McKinney?

That’s a large share of our North Texas work. Phased builds get a recurring cadence that moves with the site plan — heavier during dirt work and utilities, lighter at trim-out — plus pre-inspection sweeps on short notice when the city or the lender is coming through.

Is magnetic nail sweeping included?

On every construction sweep. Magnet bars run haul routes, gates, and laydown areas, pulling nails, screws, and tie wire that ordinary sweeping misses — protection for your subs’ tires today and the paving crew’s rubber at final.

What documentation do you provide for our SWPPP?

Dated service records for every visit — what was swept, where, and what was hauled — formatted so your site super can drop them straight into the SWPPP binder as evidence of active trackout and sediment control under the TXR150000 permit and Dallas city code.

Do you handle final cleanup at close-out?

Yes — final sweeps of streets, curbs, and flatwork, debris removal, and a final pressure wash where the finish calls for it, so the property turns over clean and the punch list stays short.

Get started

Get a construction cleanup quote for your Dallas site

Send the site details and schedule — we’ll quote track-out control and sweeps for your DFW project, documentation included.

25+ years in Texas · OSHA compliant · NAPSA certified

"*" indicates required fields

1Name
2Contact
3Property
4Details
This field is for validation purposes and should be left unchanged.